Case Study as part of a Web-based Technical and Regulatory Guidance

Vermont
Confidential Site

1. Site Information
1.1 Contacts
Ionic Waters Technologies
Vance Weems
Telephone: 775-321-8101

Dr. Timothy Tsukamoto
Telephone: 775-321-8101

1.2 Name, Location, and Description
The site name and exact location has not been disclosed at this time; therefore, will be herein referred to as “the Site.” The Site is an inactive copper mine located in Vermont with limited access. Affected media include soil, sediment, surface water (e.g., stream, rivers, runoff, and drainage), surface pool water (e.g., lakes, ponds, and pools), and groundwater. Site cleanup goals are based on the mitigation of human health risk and mitigation of ecological risk.

2. Remedial Action and Technologies
At the Site, the primary impacts are from acidity, sulfate, and metals (aluminum, cadmium, cobalt, copper, iron, manganese, and nickel). Reclamation of the site falls under the provisions of the Clean Water Act (CWA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The primary treatment technology in place at the Site is chemical precipitation.

Chemical precipitation is being used at the Site to treat up to 60 gallons per minute. The treatment system uses a calcium oxide, dry feed system and pump to provide a lime slurry to the rotating-cylinder treatment system (RCTS). This arrangement eliminates the need for a slaker system. The system uses a silo, volumetric feeder, cone-bottom dosing tank, RCTS-60HS unit, and settling pond. This system has been operating at full scale. Treatment began in July 2008, and the system was scheduled to be winterized in mid-October to November 2008 and restarted in the spring of 2009. Treatment is expected to continue indefinitely.

3. Performance
Performance and applicable standards must meet the Clean Water Act and CERCLA. Performance criteria include measuring the contaminant concentrations in water. At the Site, the RCTS is operating effectively and has eliminated the need for a lime slaker system, greatly reducing operating costs. The project has shown a 30% reduction in sludge production when compared to standard titration of the affected waters. The system will be operated seasonally.

4. Costs
Cost of activities at these site are reported as a total:

5. Regulatory Challenges
None encountered; pilot test only.

6. Stakeholder Challenges
No information available.

7. Other Challenges and Lessons Learned
None reported.

8. References
No information reported.

Image-spacer
This Web site is owned by ITRC • www.itrcweb.org
1250 H Street, NW • Suite 850 • Washington, DC 20005 • P: 202-266-4920 • F: 202-266-4937 • Sponsored by Environmental Council of the States

Disclaimer, Privacy, and Usage Policies

Click Here to Register for Free IBT Training on Document Click Here to visit the ITRC website Click Here to Go Back to the Previous Page Click Here to Visit Contaminated Dediments Team Public Page Click Here to Return to Title Page Click Here for a Printer Friendly Version of This Page