Argo Tunnel Site
Clear Creek, Colorado

1. Site Information
1.1 Contacts
Philip L. Sibrell
United States Geological Survey
Telephone: 304-724-4426
E-mail: [email protected]

Mary Boardman
Colorado Department of Public Health and Environment
Telephone: 303-692-3413
E-mail: [email protected]

1.2 Name, Location, and Description
The Argo Tunnel is located in Idaho Springs, Clear Creek County, Colorado, approximately 30 miles west of Denver (Figure 1-1). The tunnel was constructed to provide drainage and transportation for several connected gold mines. The tunnel continues to drain acidic mine water at an average rate of 280 gallons per minute. The location is at a latitude of 39°44'37" N and longitude of 105°30'28" W. The media affected is surface water and, to a much lesser extent, groundwater.

Image-Argo Tunnel Site Figure 1-1
Figure 1-1. Areal view of the Argo Tunnel area. (Map created with ESRI ArcView software using Microsoft Bing maps.)

2. Remedial Action and Technologies
The Argo Tunnel is part of the Central City/Clear Creek Superfund Site. Under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act, a conventional lime water treatment plant was constructed in 1998 and has been operating continuously.

Primary contaminants include acidity and a host of heavy metals, including aluminum, copper, iron, manganese and zinc. Site clean-up goals are based upon the mitigation of human health risk and mitigation of ecological risk.

A pilot treatment system was operated and studied periodically from 2004 through 2007 by the United States Geological Survey (USGS) Leetown Science Center. The pilot utilized a pulsed limestone bed treatment system. Up to 60 gallons per minute were treated using limestone and carbon dioxide. A polymer is added in a low dose (2-3 ppm) to effect flocculation. The solution overflows into a high-rate lamella clarifier where the solids drop to the bottom of the tank and the clarified water flows off the top. After a final pH adjustment back to neutral, the treated water is discharged to Clear Creek.

The underflow solids from the clarifier are contained in a liquid sludge, and are pumped to a plate and frame filter press for dewatering.

3. Performance
The Argo water treatment facility (WTF) was originally designed to use sodium hydroxide as the alkali source. The treatment process was able to remove over 99.9% of the metal contaminants by treating at a pH of 9.9. The treatment pH was determined by the necessity to remove manganese, while still removing other metals to low concentrations.

Performance criteria included measuring the contaminant concentrations in water, the amount of chemical consumption, and sludge production. During the various tests, the pilot system raised the pH from 3.1 to 5.1–7.3. Alkalinity was increased from undetectable to 210 mg/L CaCO3. Metal removal efficiencies varied depending on the effluent pH but ranged from less than 10% for manganese, to 5%–65% for zinc, to 50%–99% for copper, and greater than 98% for aluminum and iron.

In 2004, the treatment process was modified to use hydrated lime as the alkali source, largely due to cost considerations, with lime being more economical than sodium hydroxide. The modification also had the added benefit of increasing hardness in the receiving stream. Using hydrated lime, the treatment system continues to be able to remove over 99.9% of the metal contaminants. However, the treatment pH had to be increased to 10.1 due to the lower rate of reaction for the lime.

The treatment process obtains standard discharge limits for all metals. The 30-day average discharge limits are as follows:

Cadmium 3 ppb
Copper 17 ppb
Iron 15,800 ppb
Lead 4.8 ppb
Manganese 800 ppb
Nickel 850 ppb
Silver 0.02 ppb
Zinc 225 ppb

The treated discharge also passes Whole Effluent Toxicity testing for ceriodaphnia and fathead minnows and is nontoxic.

The solid filtercake contains approximately 15%–20% solids and passes testing of the Toxicity Characterization Leaching Procedure (TCLP). It is therefore characterized as a nonhazardous waste and is disposed of in a municipal landfill.

4. Costs
The Argo WTF had a cost of construction of approximately $5 million. Ongoing operation and maintenance costs are approximately $900,000 per year. O&M costs are largely dependent on treatment flow rates. Roughly 40% of the O&M costs is for labor, which includes five full-time employees. The plant is staffed 10 hours per day, 7 days per week.

5. Regulatory Challenges
None encountered.

6. Stakeholder Challenges
None reported.

7. Other Challenges and Lessons Learned
The State of Colorado and the Environmental Protection Agency (EPA) currently operate an acid neutralization plant to treat the Argo Tunnel discharge. Recently, the U.S. Geological Survey Leetown Science Center, in partnership with the EPA, State of Colorado, and the Colorado School of Mines transported a portable pulsed limestone bed (PLB) AMD treatment system to the site for evaluation and demonstration as a possible lower-cost alternative to the current process (Sibrell et al. 2005).

Preliminary tests were conducted in late summer 2004 and indicated that reagent costs could be cut considerably by pretreatment of the water with the system. A full suite of tests was conducted during summer 2005 to investigate the effects of water treatment rate and carbon dioxide addition on acid neutralization, metal removal, and sludge generation. The treatment system increased the pH of the water from 3.2 in the influent to 5.1–7.3 in the process effluent. Alkalinity was increased from 0 to as high as 210 mg/L as CaCO3, depending on operating conditions. Metal removal depended on the pH of the product water and varied from greater than 98% for iron and aluminum, 50%–99% for copper, 5%–65 % for zinc, and less than 10% for manganese. Although the process produced water with net alkalinity, the process effluent required post-treatment with lime to raise the pH high enough to remove zinc and manganese to dischargeable levels (Sibrell et al. 2005).

Pilot-scale post-treatment tests with lime showed that the PLB/lime sludge settled faster and resulted in sludge volumes that were 60% of the lime treatment alone. These results confirm that treatment costs at the Argo plant could be significantly reduced by pretreatment with the PLB system.

8. References
Sibrell, P. L., T. R. Wildeman, M. Frienmuth, M. Chambers, and D. Bless. 2005. “Demonstration of a Pulsed Limestone Bed Process for the Treatment of Acid Mine Drainage at the Argo Tunnel Site.Abstract. www.asmr.us/Portals/0/Documents/Conference-Proceedings/2005/1068-Sibrell.pdf.

Image-spacer
This Web site is owned by ITRC • www.itrcweb.org
1250 H Street, NW • Suite 850 • Washington, DC 20005 • P: 202-266-4920 • F: 202-266-4937 • Sponsored by Environmental Council of the States

Disclaimer, Privacy, and Usage Policies

Click Here to Register for Free IBT Training on Document Click Here to visit the ITRC website Click Here to Go Back to the Previous Page Click Here to Visit Contaminated Dediments Team Public Page Click Here to Return to Title Page Click Here for a Printer Friendly Version of This Page