Case Study as part of a Web-based Technical and Regulatory Guidance

Potosi Site
Washington County Lead District
Washington County, Missouri

1. Site Information
1.1 Contacts
Missouri Department of Natural Resources
Contacts:

Julieann Warren
Telephone: 573-751-1087
E-mail: [email protected]

Kathy Rangen
Telephone: 573-751-8393
E-mail: [email protected]

1.2 Name, Location, and Description
The Washington County Lead District Site (Figure 1-1) is part of Missouri’s Old Lead Belt, which is located in the Ozark Mountains in southeast Missouri. The Old Lead Belt provided approximately 80% of the lead produced in the United States. In Washington County, the first mines were mostly surface diggings advanced by manual labor with a pick and shovel. Starting in 1799, deeper mines were started in the area. Lead mining continued until around the end of the American Civil War. In the early 1900s, numerous small barite mines operated in Washington County. Barite mining boomed in 1926, when it was discovered that the mineral could be used as oil drilling mud. Washington County was the world’s leading producer of barite before declining in the 1980s.

Image-Potosi Site Figure 1-1
Figure 1-1. Washington County Lead District Site map.

The Washington County Lead District–Potosi Area site consists of approximately a 40–square mile region around the city of Potosi, in which extensive lead and barite mining, milling, and smelting activities were conducted for over 200 years. Potosi is located approximately 60 miles southwest of St. Louis. The Potosi Area site is located in the northeastern part of Washington County (Figures 1-2 through 1-5). The U.S. Environmental Protection Agency (EPA) proposed the Washington County Lead District–Potosi Area site for the National Priorities List (NPL) on September 19, 2007 and finalized it on March 19, 2008. The NPL is EPA’s national list of the most seriously contaminated sites that are eligible for federal cleanup under the CERCLA.

Image-Potosi Site Figure 1-2
Figure 1-2. Former tailings pond now surrounded with residential housing.
Image-Potosi Site Figure 1-3
Figure 1-3. Hand-dug mine pits adjacent to residential area.
Image-Potosi Site Figure 1-4
Figure 1-4. City of Potosi Section 8 Public Housing Authority built on lead mine waste.
Image-Potosi Site Figure 1-5
Figure 1-5. City park in downtown Potosi on former smelter site with elevated lead levels.

The primary contaminant of concern in the Potosi Area site is lead in soil and drinking water from mining, milling wastes, former smelter areas. To a lesser extent, there is concern for arsenic and barium in soil as well as cadmium in drinking water. This public health assessment will determine whether exposures to site-related contaminants have occurred in the past, present, or future at a level of health concern and recommend actions to reduce or prevent possible adverse health effects. Other sites in Washington County are also being investigated for mining-related contamination. The Washington County Lead District–Richwoods site and Old Mines site were investigated, proposed, and listed on the NPL at the same time as the Potosi Area site. Other areas in Washington County outside of the NPL sites are also being investigated for possible lead contamination.

2. Remedial Action and Technologies
During a Removal Site Evaluation (RSE) study conducted September 2005–February 2006, a total of 1,280 residential properties were tested for soil lead levels. Of this total, 675 properties (53%) contained lead in surface soils at concentrations below the EPA’s preliminary remediation goal (PRG) of 400 parts per million (ppm), 24 properties (2%) contained lead above 400 ppm only in the drip zone (area where the roof drains rainwater to the ground), 446 residences (35%) contained lead between 400 ppm and 1,200 ppm outside the drip zone, and 135 residences (10%) contained lead above 1,200 ppm outside the drip zone. Of the 135 residences with lead above 1,200 ppm, approximately 110 properties were excavated, back-filled, and reseeded as part of a time-critical removal action.

The excavated lead-contaminated soils are being transported to the Indian Creek facility, where they will be treated, stored, and disposed of as a cover for the existing mine tailings at the facility. The soil will then be revegetated to serve as a remedy for the tailings.

The residences with soil lead levels 400–1,200 ppm will be excavated as part of a non-time-critical removal action. Approximately 900 yards will need to be excavated, back-filled, and reseeded as part of the remediation.

Approximately 270 residences had groundwater wells which were contaminated with lead or cadmium above the maximum contaminant level (MCL). These residences are currently being provided with bottled water or a reverse-osmosis filtration system.

3. Performance
Performance criteria included the elimination of direct contact by removing impacted residential soils, a reduction in child elevated blood levels (EBLs) of lead, and a reduction in the bioavailability of the lead in the tailings areas. Another goal of remediation was to provide an effective means of disposal and treatment of contaminated soils while also providing an adequate cover for a large tailings pile (Indian Creek). This dual usage of excavated soils eliminated the need to transport the excavated lead-contaminated soils to a landfill or other disposal facility and the associated costs.

4. Costs
Capital costs: Approximately $15,000 per property with 110 residential yards remediated so far.
Operation and maintenance: To be determined.

5. Regulatory Challenges
None reported.

6. Stakeholder Challenges
There was significant public outreach from the start of the initial investigation. The community was concerned about health issues and property values.

7. Other Challenges and Lessons Learned
Involving the local officials from the beginning of the investigation, especially the county health department, led to greater public support of the overall process.

8. References
Missouri Department of Health and Senior Services. 2009. Public Health Assessment Washington County Lead District-Potosi Area, Washington County, Missouri (initial release).

U.S. Environmental Protection Agency Region 7. 2006. Final Statement of Basis for Remedial Action Plan, Indian Creek Facility, Washington County, Missouri. Air, RCRA and Toxics Division.

Image-spacer
This Web site is owned by ITRC • www.itrcweb.org
1250 H Street, NW • Suite 850 • Washington, DC 20005 • P: 202-266-4920 • F: 202-266-4937 • Sponsored by Environmental Council of the States

Disclaimer, Privacy, and Usage Policies

Click Here to Register for Free IBT Training on Document Click Here to visit the ITRC website Click Here to Go Back to the Previous Page Click Here to Visit Contaminated Dediments Team Public Page Click Here to Return to Title Page Click Here for a Printer Friendly Version of This Page